Installation planning
Timber Floors Before Christmas: How to Plan a Sydney Install or Sand and Polish
By Design Timber Flooring · Updated · 7 min read
How to plan a new timber floor or sand and polish before Christmas: product supply, acclimatisation, coating cure milestones, room order and hosting guests.
If you want a new timber floor or a sand and polish finished before Christmas, the real deadline is not the last day of work but the day each room can take furniture, rugs and guests again. Work backwards from that date, allowing for product supply, any acclimatisation the manufacturer requires and the coating's return-to-service times. Ask for current availability early, because every one of those stages has to fit before the holidays.
This guide sets out the decisions to make now and the order in which they usually fall. It is a planning aid only. Supply times, acclimatisation and cure times are set by the product and coating manufacturers and confirmed after an on-site assessment.
Why does the pre-Christmas period need more planning?
Spring and early summer are a popular time to renovate, because many households want rooms finished before family visits, end-of-year gatherings or a holiday away. That means product orders, trades and deliveries may all be busier than usual. Some suppliers and manufacturers also change their hours around the holidays.
None of that means the work cannot be done. It means the stages need to be planned in order, with some allowance for the parts you do not control.
What has to happen, and in what order?
| Stage | New floor (supply and install) | Sand and polish | What sets the timing |
|---|---|---|---|
| Assessment and quote | Measure, check subfloor and moisture, choose product | Check board condition, repairs and coating options | On-site inspection |
| Product supply | Boards, underlay, adhesive and trims ordered | Coating and filler ordered if needed | Supplier stock and lead times |
| Acclimatisation | Boards delivered to site ahead of installation if the manufacturer requires it | Not usually a separate stage | Manufacturer instructions and site conditions |
| Preparation | Removing old flooring, levelling, subfloor work | Lifting carpet, removing staples, replacing damaged boards | Condition found on site |
| Installation or sanding | Laying boards, then trims and skirting | Sanding, filling and any stain | Floor area and layout |
| Coating and cure | Coating applied if the floor is site-finished | Each coat dried before the next | Coating manufacturer's return-to-service times |
Prefinished engineered boards skip the on-site coating stage, which can simplify the programme. Raw solid timber that is sanded and coated after laying adds that stage back in. Our guide to solid vs engineered timber explains the difference in more detail.
How much time should you allow for product supply?
Supply depends on the product, the species and grade, the board size and whether it is held in stock. Popular Australian hardwoods such as Blackbutt and Spotted Gum may be readily available in some profiles and not others. Imported products such as European Oak can have their own supply timing.
Rather than relying on a general rule, ask for the supply time of the specific product you choose, and confirm it before setting a start date. If a product is not available in time, it is better to know early and choose an alternative than to compromise on the finish.
Does new timber need to acclimatise before Christmas installation?
Some manufacturers specify that boards are delivered and left on site for a period before installation, so they can adjust to the home's conditions. Others do not require it, or set conditions for how and where the boards are stored. Follow the manufacturer's instructions for the product you choose.
In practice, this means the delivery date and the installation date may not be the same day. Leave a clear, dry space for boards to be stored, away from wet areas, and keep the home at normal living conditions where possible.
When can rooms be used again after coating?
This is where most holiday plans succeed or fail. A freshly coated floor passes through separate milestones:
- Light foot traffic. Careful walking in clean socks, no shoes or pets.
- Furniture back in. Items lifted, not dragged, onto protective pads.
- Rugs down. Usually the longest wait, because a rug can affect how the coating cures.
- Normal use. Full household traffic, including guests, children and pets.
Each milestone is set by the coating manufacturer and can be affected by temperature, humidity and ventilation. Our article on how long sanding and polishing takes explains these milestones in detail. If you are hosting a large gathering, plan it around the last milestone, not the first.
How should rooms be sequenced if you are staying at home?
If you are living in the home during the work, the order of rooms matters. Discuss these points at the quote stage:
- Which rooms connect to the kitchen, bathrooms and bedrooms, and how you will reach them.
- Whether a hallway or entry needs to be done separately so the home stays accessible.
- Where furniture will be stored while each area is worked on.
- Pets, alarms, pilot lights and ventilation while coating is drying.
Some households choose to be away during the coating stage, which can make the programme simpler. Our guide to preparing your home for a floor installation covers clearing rooms and access in more detail.
Should you split the job into stages?
Splitting the work can be sensible when the full scope does not fit comfortably before the holidays. Common approaches are finishing the main living areas first and leaving bedrooms or a study for later, or completing repairs now and a full sand and polish when the house is quieter.
Splitting has trade-offs: a second visit means clearing rooms again. If you plan to match new boards to an older floor later, read our guide to matching existing hardwood floorboards.
What should you decide now?
- The rooms included and any that can wait.
- Supply and install, or sand and polish of existing boards.
- Species, colour and board width, with samples viewed in your own light.
- Prefinished or site-coated, and the coating sheen.
- The date each room needs to be usable, and for what.
- Where you and your furniture will be during the work.
For new floors, see our supply and install service. For existing boards, see floor sanding and polishing. Boards with damage may need floorboard repairs before anything else.
What to have ready for a quote
- The rooms and approximate areas you want done.
- Photos of the current floor, including any damage, gaps or stairs.
- Whether the home is a house or apartment, and any strata or building rules.
- Your preferred species or look, if you have one.
- The date you need rooms back in use, and any holiday plans.
Check that your suburb is covered on our service areas page, then book a free on-site quote and ask for current availability. Jimmy can confirm what is realistic for your rooms before you commit.
Common questions
Is it too late to get new timber floors installed before Christmas?
It depends on product supply, any acclimatisation the manufacturer requires, the amount of preparation needed and the coating's cure times. Ask for current availability and the supply time of your chosen product as early as possible. If the full scope does not fit, finishing priority rooms first is a common option.
How far ahead should I book floor sanding before the holidays?
Book early enough to allow for the assessment, any repairs, the sanding and each coat's drying time, plus the wait before furniture and rugs can return. These times vary by coating system and site conditions. Ask for current availability and plan your gathering around the date rooms are fully usable.
Do timber floorboards need to acclimatise before installation?
Some manufacturers require boards to be stored on site for a period before installation, while others do not or set specific storage conditions. Follow the instructions for the product you choose. This can mean delivery happens before installation, so plan a clear, dry space to store the boards.
Can I host guests on a freshly polished floor?
Hosting usually needs the floor to have reached full return to service, not just light foot traffic. Furniture and rugs often have longer waits set by the coating manufacturer. Confirm each milestone for each room before setting the date of a gathering.
Can I live at home while floors are done before Christmas?
Often parts of the home can stay in use, but rooms being worked on and coated cannot be used until the coating allows. Whether it works depends on the layout and how rooms connect to kitchens, bathrooms and bedrooms. Plan the room sequence at the quote stage.
Is prefinished engineered timber quicker to install before the holidays?
Prefinished engineered boards do not need on-site sanding and coating, which removes that stage from the programme. Supply time, subfloor preparation and the installation method still apply. Whether it suits your home depends on the subfloor and the look you want.