
Installation planning
Timber Flooring in a Sydney Apartment: 8 Things to Sort First
By Jimmy, owner of Design Timber Flooring · Updated · 4 min read
Get your strata's flooring rules and approval in writing before you pick a board. The colour is the last decision, not the first.
Before you pick a board for your Sydney apartment, get your building's flooring rules in writing. Strata rules, the slab you've got and the install method decide what you can lay. Colour comes last.
NSW Government guidance lists installing or replacing hard flooring as a renovation that needs approval. Read the current NSW strata renovation guidance and ask your strata manager how your scheme handles it. Here are the eight things I sort out with apartment owners before anyone orders a box of boards.
1. Get your building's flooring rules
Ask for the current by-laws and any flooring application forms. Keep the actual documents.
What your neighbour put down means nothing. Each building has its own floor build-up, approval conditions and acoustic rules.
2. Find out how approval works before you order anything
Who gets the application? What do they need from you? How do they tell you it's approved?
Talk the job through with your strata manager, especially if it goes deeper than the floor covering. Booking me in doesn't count as approval. I won't start until you've got the tick in writing.
3. What acoustic proof does your building want?
Ask what paperwork has to back up your flooring system, and whether they want advice or testing done for your apartment specifically. A label on an underlay roll doesn't describe the whole floor and ceiling.
There's no magic underlay that gets approved in every building in Sydney. The proof has to match your building and the floor you're actually putting in.
4. What's under the carpet?
Pull up old carpet and you can find a slab that needs work: moisture, humps and dips, old glue, level changes between rooms.
Photos are handy when you first get in touch. But I need to see the floor to know what the job involves.
5. Compare the whole system, board and all
Shortlist boards together with the fixing method your building approves and whatever underlay or extra layers it needs. Swap one part and the whole proposal has to be checked again.
My glue-down versus floating guide covers the questions to ask about each.
6. Check your door heights
Look at the front door, internal doors, where the floor meets the balcony and the rooms next door. The finished height is the whole build-up, not just the board.
If there's a door that can't be trimmed (fire doors in some buildings, for one), tell me early. We sort that detail before materials get ordered.
7. Lifts, deliveries and work hours
Confirm work hours, lift bookings, delivery access, rubbish removal and how common areas get protected. If boards have to go up stairs or through a tight entry, tell me.
Keep your building manager in the loop. A grumpy building manager can hold up a job faster than any slab problem.
8. Keep all the paperwork in one place
Hang on to the approved scope, the product details, the acoustic proof and the care instructions. If the product or the method changes, check your approval still covers it.
We agree up front what paperwork you get from me at handover.
Which decisions come first?
| Before you lock in | Have this ready |
|---|---|
| A flooring product | Your building's rules, the rooms you want done and what the floor is built from now |
| An acoustic solution | What your building wants as proof, and any specialist advice it asks for |
| An install method | The product instructions and a look at the slab |
| A start date | Written approval where needed, delivery access and the allowed work hours |
Be wary of any product sold as "strata approved" with no mention of your building. Ask which floor build-up was tested and how that relates to your apartment. If you need specialist acoustic advice, get it BEFORE you order.
Ready to get started?
I lay engineered timber floors all over Sydney, including Eastern Suburbs apartments, units in North Sydney and unit blocks around Cronulla. Once the job's approved, my prep checklist for install day helps you get the place ready.
Have your suburb, your current floor and your building's rules handy, then book a free on-site quote. I'll tell you straight what your building will let you lay.


