Skip to content
Design Timber Flooring logo

Renovation decisions

How to Choose a Timber Flooring Installer in Sydney: 9 Questions

By Jimmy, owner of Design Timber Flooring · Updated · 8 min read

Two quotes for the same rooms can be two very different jobs. Ask an installer these nine questions before you sign, and judge them on the answers.

Pick the installer who comes out, looks at your subfloor, checks for moisture and writes down exactly what they'll do. The total price is the least useful thing on the page. These nine questions sort out who's going to do the job properly.

You'll walk on this floor every day for decades. A floor laid over a damp slab, fixed the wrong way or finished badly at the doorways looks fine on day one and gives you grief for years.

Ask every installer these, me included. Make them answer about your house and your boards. Floors in general don't count.

Why is the total the wrong thing to compare?

Most people get two or three quotes and look at the bottom line. Trouble is, the stuff that decides how a timber floor lasts is the stuff you can't see once the boards are down: the subfloor checks, the moisture readings, how flat the floor is and how the boards are fixed.

Two quotes for the same rooms can describe completely different jobs. These questions tell you which one you're buying.

The work that matters most is the work you'll never see once the boards are down.

1. Who's actually doing the work?

Plenty of flooring businesses quote the job, then hand it to a subcontractor you've never met. You should know that before you sign. Ask:

  • Will the person quoting be on site during the job?
  • If it's a crew or a sub, who's in charge on the day, and who do you ring if something's wrong?

For what it's worth, I quote the job, I run the job and I sign it off. No subbies. You'll have my number the whole way through.

2. Will you come and look before giving a price?

A firm price off photos is a warning sign. An installer needs to see the existing floor, the subfloor where they can get to it, the doorways, the stairs and how the rooms join up.

Without that, the price is a guess. And guesses grow once the old floor comes up (ask me how I know). If your installer won't come out and look before quoting, find another installer.

3. How will you check moisture and the subfloor?

Timber and moisture don't get along. Lay boards over a damp slab or a crawl space with no airflow and you get cupping, gaps or lifting down the track. Sydney summers make it worse.

Ask how they check moisture in the subfloor AND in the boards, and what they do if the readings are off. Then ask about flatness. If the floor isn't flat enough for the product, it needs prep first, and that prep belongs in the quote.

4. Which installation method will you use, and why?

There are three main ways to lay timber. Nailed or secret-nailed to joists or battens, glued straight to the subfloor, or floating over underlay.

The right one depends on the product, the subfloor and the manufacturer's instructions. In apartments the building's rules come into it too.

A good installer tells you why that method suits your floor. "That's how we always do it" is a lazy answer.

Weighing up engineered boards? Read glue-down versus floating engineered timber.

5. What exactly is included?

This is where quotes differ the most. Check every quote covers the same things:

  • Pulling up and dumping the old floor.
  • Subfloor prep, like levelling, grinding or patching.
  • The boards, plus underlay or glue if it needs it.
  • Skirting, scotia, trims and thresholds at the doorways.
  • Stairs, if you've got them.
  • Sanding and coating, for raw timber.
  • Moving furniture, and the clean-up at the end.

The cheapest quote is the one with the most left out.

My guide to what affects a timber flooring quote shows you how to go through two quotes line by line.

6. What happens if you find something under the old floor?

Some problems only show up once the old floor is lifted. Rotten boards, termite damage, damp, a slab that dips. That's normal.

What counts is how it's handled. Ask how extra work gets explained and priced, and get them to agree that nothing outside the written scope goes ahead without your OK.

7. Can I see recent work and read reviews?

Read the recent Google reviews. The star rating on its own tells you very little. Look for jobs like yours, and see how the business replies to a bad one.

Ask for photos too, especially for something fiddly like herringbone or chevron or timber stairs. We're sitting on 5.0 from 22 Google reviews, and the one I'd point you to is Joanne's. Her stain colour wasn't right the first time, so I sent the team back until she was happy.

8. What warranty do I get, and who's behind it?

There are two, and they cover different things.

  • The product warranty comes from the manufacturer. It covers defects in the boards, with conditions about installation, humidity and care.
  • The workmanship warranty comes from the installer and covers how the floor was laid.

Get both in writing and ask what voids them. Most product warranties depend on the floor going down to the manufacturer's instructions, which is why question 4 matters.

9. Are you insured, and is the paperwork right?

Ask about public liability insurance. Where the work needs a licence in NSW, ask for the number and look it up on the NSW Government's licence check.

Get a written quote or contract with the scope, the price and the payment terms. NSW Fair Trading has plain-English info on home building contracts and deposits. Read it before you sign.

What are the red flags with a flooring installer?

  • A firm price without anyone seeing the floor.
  • Pressure to sign today, or a discount that vanishes tomorrow.
  • A big payment upfront before any work starts or any materials turn up.
  • A one-line quote with no detail.
  • "We can lay it over anything," with not a word about moisture or flatness.
  • Nobody can tell you who's doing the work.

What does a good quote look like next to a bad one?

A thin quoteA proper quote
A total and a product nameProduct, grade, board size and finish spelled out
Nothing about the subfloorMoisture and flatness checks, with prep included
Method not mentionedThe install method and why
Trims and skirting "extra if needed"Doorways, skirting and thresholds listed
No plan for surprisesHow hidden problems get explained and priced
A verbal warrantyProduct and workmanship warranties in writing

How do I answer these?

So you've got something to measure against: I quote for free, on site. I look at the floor and what's under it, tell you which method I'd use and why, and put the scope, the warranties and how we handle surprises in writing before you book.

The price is fixed. What I quote is what you pay.

We work all over Sydney, from the Northern Beaches and Eastern Suburbs to the Hills District and Western Sydney. Our supply and install service walks through how a job runs from picking boards to handover.

If someone else answers these better for your job, hire them. I mean that.

Common questions

How do I choose a good timber flooring installer in Sydney?

Pick the one who inspects your floor before quoting and puts the whole scope in writing. Ask who does the work, how they check moisture and the subfloor, which install method they'll use and why, what's included and what warranties apply. Then compare the written quotes line by line.

Should a flooring installer see my home before quoting?

Yes, every time. They need to see the existing floor, the subfloor where they can get to it, the doorways, stairs and how the rooms join up. A price off photos is a guess, and guesses grow once the old floor comes up.

Why are timber flooring quotes so different?

Because they include different things. One covers removal, subfloor prep, skirting, trims and sanding, and another leaves them out. Compare the scope line by line.

What warranty should I get on a new timber floor?

Two: a product warranty from the manufacturer and a workmanship warranty from the installer. Get both in writing and ask what voids them, like an install that doesn't follow the manufacturer's instructions.

Discuss your flooring project.

Tell Jimmy about your property, existing floor and preferred look. We’ll arrange a time to assess the site and discuss suitable options.

Call JimmyRequest a quote